Success Story

Extend The Life Cycle Of Your Existing Energy Solution

Customer: SINIAT BV

The gypsum board production process at SINIAT requires a continuous supply of 5.8 MWth heat and 1.8 MWe electric power. SINIAT operated a KG2 gas turbine with low electrical efficiency 14%, delivering only 1.1 MWe electricity. They wanted higher electrical efficiency along with high temperature heat. SINIAT wanted to install the gas turbine in the same area as the existing KG2 gas turbine within just two weeks so to avoid downtime.

Part of the gas turbine exhaust is ducted to two calciners. As the temperature requirement of the calciners is higher than the exhaust gas temperature, post-firing is applied. As the exhaust gases still have around 15% O2, post-firing is possible without additional ambient air blending. The remaining part of the exhaust is ducted to the board dryers, where a lower temperature but higher flow rate is required for the desired drying effect. Exhaust gases are blended with ambient air and post-firing is applied as necessary to control the temperature.

Are you interested to find out more information about this project and read about key results and benefits from the OP16 solution?

You can download the full success story from our Resources page.

Oct 27
WEBIANAR in Russian Language Газовые турбины OPRA: Технологии, Сервис, Аренда

Приглашаем Вас посетить вебинар по теме: Газовые турбины OPRA: Технологии, Сервис, Аренда который состоится 27 Октября в 13:30 MSK | 11:30 CET. Зарегистрироваться! Во время вебинара мы обусидм:

  • OPRA как независимый источник энергоснабжения и тепла
  • Готовые решения OPRA в разных сферах: нефть и газ, промышленность и бизнес, переработка отходов, морское применение-
  • Локальная сервисная поддержка
  • Аренда газовых турбин в соответствии с Вашим запросом
Oct 28
WEBINAR OPRA’s Power Generation Rental Solutions

Join our free webinar on October 28, 2020 at 16:30 CET to see OPRA’s power generation rental solution and its financial benefits. Register Today!

Nov 04
WEBINAR Repowering, replacing and life extension of 1 to 2 MW Gas Turbines

Join our webinar on October 4th 2020 at 16:30 CET to learn about OPRA’s digital service including remote monitoring and predictive maintenance system; repowering, replacing and life extension of existing equipment such as the OP16, KG2 and Solar Saturn and other larger or smaller gas turbines; optimizing your power and thermal needs; unparalleled service support close to our customers worldwide. Register Now 

Nov 05
EXHIBITION CIIE, 5-10 November 2020

OPRA will exhibit at the 3rd China International Import Expo, CIIE, from 5 to 10 of November 2020